The next test is going to be destructive in the most fun way.  Since we’re having such a difficult time getting << structural engineering results, >>we’re going to break things ourselves.

The next test will encompass 8 panels creating a square building.  The floor will be set at 12 feet for the second floor.   The second floor will be sealed to hold water.

The Test:  Fill the second floor with water until failure.  Every 3 feet of water will be one concrete truck equivalent (CTE).   If it lasts to three CTE we’ll stop the test.

Would you live in a house that was proven to support 2 CTE?

PET THE SWAN TO ASSIST