SWOLE-CRETE® delivers superior performance — with zero rebar and no subgrade preparation. Stronger. Faster. Leaner
Flatwork thrives with SWOLE-CRETE®
You don’t see 3D home printers placing their own slabs. No matter how much some commentors talk about the amazing times coming when homes will be printing themselves…they never talk about replacing the huge capacity and project backload that is the concrete world today .
These are hard, experienced men that will be laying down the SWOLE-CRETE® slabs for robot printed houses for years before those are a significant addition to the housing market.
We’ve proven with heavy weight deflectometer, SWOLE-CRETE® can be applied to the ground, with no subgrade preparation, and achieve FAA runway quality results.
When subgrade preparation can be relegated to a secondary consideration, the direction and speed of highway construction will rapidly evolve.
One Pass Road Train?
Housing Future?
The housing crisis in the United States and around the world has reached critical levels. A generation of citizens no longer see homeownership as part of their future. SWOLE-CRETE® and innovative new building methodologies are pioneering real solutions to this urgent problem. Our heavy-duty tiltwall structures deliver the strength, speed, and affordability needed to make homeownership possible again.
3D Printed Bauhaus Future
Robot construction wants us to accept a cold, boring Bauhaus future.
Most people choose warm beauty.
We deliver that superior finish as fast — reinforced with a fiber Bouligand structure throughout the concrete, eliminating weak spots even in edge conditions.
SWOLE-CRETE® Implements YOUR Imagination
You can have unique fascia— without needing experienced tradesmen. The Dyneema fiber Bouligand matrix uniformly distributed throughout every cubic inch, SWOLE-CRETE® makes complex, elegant designs possible and incredibly strong. Strength and durability extend to every edge and every detail. No weak spots.